top of page

Offices

Office interior work as the last phase of a building project before it can be habitable, needs to incorporate elements of Identity, branding, company priorities, and actualization. BIM as a model-first process provides a complete visibility of a space down to the smallest detail and allows information sharing across project teams much more frequently. This gives all contributors a holistic opportunity to coordinate works packages and to catch unforeseen issues before site installation.

BIM Rainton Bridge.png

Rainton Bridge

Location:  Durham, United Kingdom

Details:     3,000 Sqmt

Stage:       RIBA Stage 3 to 4

Scope:      CAD-Building Services 

 

Rainton bridge business park is strategically located and offers Grade 'A' office accommodation.  The building is comprised of flexible, open-plan floor plates with only a single set of columns.  LG3 Category 2 complaint lighting integrated with suspended metal tile ceiling was provided.

Working for a building services consultant we  at Ode were entrusted with working on CAD layouts of  all the building services, plant rooms and schematics.

Darlington Growth Hub

Location:  Durham, United Kingdom

Details:     7,400 Sqmt

Stage:       RIBA Stage 3 to 4

Scope:      CAD-Building Services 

 

The project comprises office and retail spaces. 

We at ODE carried out the CAD work for all building services. The existing schematics floor layouts and plant rooms were redesigned and detailed from the existing scheme design. 

Spencer place.PNG
BIM_ODE_Commercial_India_Hanover Square.jpg

Hanover square

Location:  London, United Kingdom

Details:     11,800 Sqmt

Stage:       RIBA Stage 3 to 4

Scope:      BIM-Building Services 

 

This revitalized eight-story building comprises of premium office space. Additionally, the mixed-use building includes six luxury flats and units for either retail or restaurant use, expertly finished.

 

ODE carried out the BIM work for all services and provided design support selected the pumps, HRUs, fans based on performance parameters and used the manufacturer family of particular models.  

Farnborough Business Park

Location:  Farnborough, United Kingdom

Details:     8,500 Sqmt

Stage:       RIBA Stage 3 to 4

Scope:      CAD-Building Services 

 

Known as The Staging Post, the Lampton Road residential development is located on the site of the former Civic Centre. 

 

ODE carried out the BIM work for all services, riser layouts and plant rooms.

BIM Farnborough Business Park_edited.jpg
Scalpel BIM.jpg

The Scalpel Level 6,7,8

Location:  London, United Kingdom

Details:     4,000 Sqmt

Stage:       Fitout Services

Scope:      BIM-Building Services 

 

The Scalpel is a striking 190-metre office tower in the heart of the City of London,  A distinctive addition to the skyline, the building with its neighbours complements the overall composition of the ‘City Cluster’ whilst improving the public realm. The simple geometric form of the 35-story tower is reinforced by the partially reflective glass and bright metallic fold lines.

ODE carried out the BIM work for all services on the mentioned floors. The work involved the partial dismantling of the existing layout to accommodate changes called for in the new layout for the incoming tenant.

Dubai Future Foundation/Museum of the Future

Location:  Dubai, UAE

Details:     Office Fitout

Scope:      BIM-Building Services 

 

Located in a prestigious high rise complex the offices were deigned to give a modern futuristic look to the working space. Innovative concepts of work-pods were integrated with meeting rooms, auditorium, cafeteria and open plan offices to provide a sense of individuality in an easy mingling work space. 

ODE carried out the BIM work for all services, riser layouts. This was a fit-out project with provisions of existing service tap offs available. The location of tapoffs existing services and architectural and structural elements were ascertained with Point cloud survey and was used to model the existing services and new our new services around them.

Image4.png
bottom of page